GOSPEL ISLAND BRIDGE REPLACEMENT

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

 

This project was performed under stringent environmental considerations. The obsolete bridge was replaced with a new 160’ long, 5 span structure that incorporated a composite deck design, (precast slab topped with a 6 ½" concrete deck).  As the bridge closure required residents to navigate a 9 mile detour route, the work was expedited earning an Early Completion Incentive Bonus.

Project Details

  • Location:
    Citrus County, FL
  • Completed:
    2007
  • Awards:
    FDOT 2007 Best in Construction Bridge Project Award
  • Client:
    FDOT

  • <!-
  • -
    contract Value:
    $3,222,000
  • -->