• Call us: (352) 787-1616
  • Email us: info@lewarecc.com

 

sr 44 & sr 35 over csx railroad

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

 

To enable FDOT to use existing rail tracks in the metropolitan Orlando area for the proposed SunRail commuter train, at-grade crossings on parallel CSX tracks needed to be replaced with overpass structures due to the increased freight traffic. The new 528’ long SR-44 overpass consists of a 5-span bridge located just south of the Wildwood switch yard.  The SR-35 site, within the switch yard, was a 2-phase replacement of an antiquated 2-lane bridge.  The new 3 span structure is 418’ long.  Both new bridges  accommodate four lanes of traffic with shoulders and sidewalks on each side

Project Details

    • Location:
      Sumter County, FL
    • Completed:
      2011
    • Awards:
      2011 FDOT Best in Construction Bridge Project Award

  • Client:
    FDOT

  • subcontract Value:
    $12,114,000