• Call us: (352) 787-1616
  • Email us: info@lewarecc.com

 

sr 46 wildlife crossing

  • 1
  • 3
  • 2
  • 4
  • 5

 

Due to the regional growth and the increasing number of wildlife accidents, safe corridors for the Florida Black Bear was needed.  The design parameters of this project was to provide a 2-span reinforced concrete structure and high fencing to allow safe passage for wildlife between Seminole State Forest and Wekiva Springs State Park.

Project Details

    • Location:
      Lake County, FL
    • Completed:
      2003
  • Client:
    FDOT

  • contract Value:
    $1,749,000